Pickering, Corts & Summerson, Inc.
Pickering, Corts & Summerson, Inc.
Consulting Engineers, Land Surveyors, Planners and Landscape Architects
News:

News: PC&S Performs Emergency Bridge Inspection on Interstate 95


3/26/2008


On Wednesday, March 19th, PennDOT called on Pickering Corts & Summerson’s (PC&S) Bridge Inspection group to perform an emergency inspection on the steel and concrete overpass that carries Interstate 95 over Richmond Street in Philadelphia PA.

Earlier in the week, a 6-foot crack in the 15-foot tall column was detected. This discovery led transportation officials to close the three-mile stretch of the highway. The PC&S Inspection Team was brought on the scene early Wednesday morning to make sure there were no other problem areas under the I-95 viaduct before reopening the highway.

Watch an exclusive interview with PC&S’s Bridge Inspection Division Manager, John Wilhelm, P.E., on 6abc news.


In photograph (right to left) Jim White, PC&S Bridge Inspection Manager, and John Wilhelm, PE, PC&S Bridge Inspection Division Manager, Inspect the overpass that carries Interstate 95 over Richmond Street in Philadelphia.


A close up of the 6-foot crack in the 15-foot tall column that led officials to close the three-mile stretch of I-95 in Philadelphia.



« Back

Copyright © 2005 - 2010 Pickering, Corts & Summerson, Inc. SITE MAP