Projects: 22 On-System and 7 Off-System New Jersey Transit Bridges, Two Cycles

Client:    NJDOT
Location:    Statewide, NJ
Type/Size:    Routine NBIS Inspections
Services:    Bridge Inspection


This project involved routine NBIS inspections of 22 on-system and 7 off-system bridges including three Fracture Critical structures located over New Jersey Transit's North Jersey and Atlantic City coastlines.

The project included Load Factor Ratings of several posted structures, and interim inspections. The majority of the bridges inspected required special equipment such as large ladders and 35 ft and 50 ft Bucket Trucks. PC&S worked closely with NJT and Conrail to ensure the highest level of safety for both the traveling public and our crews.