Our Latest News

PCS Projects — Yost Road over Stony Brook Tributary, Whitpain Township, Montgomery County

PCS provided the structure, highway, civil and traffic control engineering for this $1M bridge replacement project for Whitpain Township.  The existing single span bridge was replaced with an at-grade 22’ x 5.5’ single cell precast concrete box culvert designed in accordance with PennDOT standards using a cast-in place concrete deck slab, sidewalls, wingwalls and vertical wall bridge barrier with an architectural surface treatment.  Utility coordination involved the relocation of aerial power and communication lines and underground sanitary and water lines.

PCS managed the project design tasks and provided survey, plot plans and legal descriptions for township right-of-way acquisitions, permits, plans, cost estimate, bid documents and construction inspection services.

close Created with Sketch.

This Website Does Not Support Internet Explorer. Please Use Another Browser To View This Site.

We recommend using Google Chrome